St Mary’s University College is creating a new training venue to accommodate a sports hall, athlete conditioning, assessment and physiotherapy facilities.
The new facility will have a 25mx25mx12m high hall and a 85m long fitness and conditioning block that has been designed and specified to achieve an excellent BREEAM rating. It has been used as the National Team Training Base for the 2012 Olympics.
The BIM (Building Information Modelling) includes full spatial and material details for foundations, structural steelwork, pre-cast concrete, engineered timber, timber framing and structural cladding.
Swipe for more