Norland Place, London W11

ResidentialCivil EngineeringRefurbishment
2020

The project involved the subterranean extension and remodelling of a mews house and its courtyard in Holland Park.

Client

Private Client

Architect

MSMR Architects

We worked closely with acoustic consultants, Sandy Brown, and specialist acoustic suppliers, Total Vibration Solutions, to come up with a workable, effective and economic solution.

The mews was essentially reconstructed with steel framing, and included an interesting staircase that cantilevered off the steel framed side walls.

Traditional underpinning was used, however due to the proximity of the Central Line tunnels, additional measures were taken to isolate the new construction from potential vibration and noise.



Gallery

Swipe for more


Projects

Open/Close Filter