Construction of a new school building on an undeveloped plot between the Pavilion and the former Chapel. The project also included the remodelling of part of the Pavilion.
The new spaces are used as social spaces by the 6th form. At the upper level it forms a foyer and break-out area as well as a space for informal assembly and performance.
The new two storey building has piled foundations supporting a hybrid of load bearing blockwork, timber wall panels and frames constructed from green oak. The upper floor structure is a mixture of pre-cast concrete floor panels and softwood timber floor joists.