Montpelier St, London SW7
The construction of 7 new storeys of high specification accommodation above a basement behind a retained façade.
CLIENT: FINCHATTON, ARCHITECT: HAMILTONS, VALUE: £14M, COMPLETION: 2010
Pitt Street, Campden Hill, Kensington
A large detached house in Kensington which has been designed with high ceilings and very wide lateral spaces.
CLIENT: HILL SPINK, ARCHITECT: WELDON WALSHE, VALUE: £M, COMPLETION: 2010
Cambridge Terrace & Chester Gate
The refurbishment and extension of a Grade I listed property in one of the grand terraces designed by John Nash in the 1820s.
CLIENT: CAMBRIDGE TERRACE DEVELOPMENTS, ARCHITECT: MOXLEY ARCHITECTS, VALUE: £15M, COMPLETION: 2010
Ossicles, Henley on Thames
The replanning and rebuilding of a house on the banks of the River Thames. The private clients are extending and remodelling their existing property to generate a larger more modern house on the same footprint.
PRIVATE CLIENT, ARCHITECT: SPRATLEY ARCHITECTS, VALUE: £1M, COMPLETION: 2010
Mulberry Walk, Chelsea
Work was carried out on an existing 3 storey Edwardian house in chelsea, opening out and generating double storey and triple storey height volumes.
PRIVATE CLIENT, ARCHITECT: COLLETTE ZARZYCKI, VALUE: £2M, COMPLETION: 2008
Percy Street, Fitzrovia, London W1
The conversion and extension of a Grade II listed house. The rear extension is constructed out of prefabricated timber panels which were installed in just one day.
2007 Off-Site Construction Award
CLIENT: HAYCYON PROPERTIES, ARCHITECT: SATELLITE DESIGN WORKSHOP, COMPLETION: 2007
Culross Street, London W1
A mews house in central London was refurbished and interior spaces re-arranged.
PRIVATE CLIENT, ARCHITECT: WOLFF ARCHITECTS, COMPLETION: 2007
Cedar House, Cringleford, Norwich
A large timber framed house which structurally comprises three linked buildings. The panels are being constructed off-site to meet a tight build programme. See construction in 30 seconds cedarhouseproject.co.uk.
PRIVATE CLIENT, ARCHITECT: CRISPIN LAMBERT ARCHITECTURE, COMPLETION: 2007
Manresa Road Development, Apartment Fit-Outs
Structural advice on the fitting out of a number of apartments in the Manresa Road Development.
VARIOUS VALUES: 2.5M - 6M
Manresa Road Development, Chelsea
A major project involving the complete rebuilding of a terrace in Chelsea behind the existing front façade to provide 15 luxury flats.
CLIENT: MANRESA DEVELOPMENTS LTD/MULTIPLEX, ARCHITECT: WELDON WALSHE/ WOODS BAGOT, VALUE (excl. fitout): £43M, COMPLETION: 2006
Carlton Drive Putney
A development comprising the rehabilitation and extension of two Victorian villas together with the construction of two new apartment blocks to provide 47 flats round a new courtyard.
CLIENT: W J MARSTON & SONS, ARCHITECT: FEILDEN CLEGG BRADLEY STUDIO, VALUE: £11.2M, COMPLETION: 2006
Burghley Road, Wimbledon
The major refurbishment of a large detached house in Wimbledon with the addition of new facilities.
PRIVATE CLIENT, ARCHITECT: CAST, COMPLETION: 2006
Lansdowne Road, Cambridge
A unique award winning two storey house situated on the western outskirts of Cambridge.
PRIVATE CLIENT, ARCHITECT: DONALD INSALL ASSOCIATES, VALUE: £2.5M, COMPLETION: 2006
Hans Place, Knightsbridge
The conversion of four apartments into a single six storey residence in Knightsbridge. CLIENT: HILL SPINK, ARCHITECT: WELDON WALSHE, COMPLETION: 2006

Lingham Court, Stockwell
An award winning development to provide 60 units of accommodation using light gauge steel. The innovative construction is a hybrid of panel & pods.
2005 Housing Design Awards
CLIENT: METROPOLITAN HOUSING TRUST, ARCHITECT: POLLARD THOMAS EDWARDS, VALUE: £8M, COMPLETION: 2005

 

Oakridge Regeneration
A phased development of 300 units of social housing using light gauge steel panel construction.
Building for Life Case Study

CLIENT: OAKFERN HOUSING ASSOCIATION/SENTINEL HOUSING GROUP, ARCHITECT: HTA, VALUE: £23M, COMPLETION: 2005
Cambridge Riverside
A private development of 77 apartments overlooking the River Cam. There are five blocks each with four or five storeys over car parking accommodated below ground.
CLIENT: FUSION SOLUTIONS, ARCHITECT: STEFAN ZINS ASSOCIATES, VALUE: £11M, COMPLETION: 2005
Dwarf House
A private residence built on a plot previously occupied by 2 mews houses. The new house has five levels, two of which are below ground.
ClLIENT: OMNIWAY PROPERTIES, ARCHITECT: WELDON WALSHE, VALUE: £10M, COMLETION: 2005
Applecroft Road, Welwyn Garden City
Two new houses using modular design.
CLIENT: GENESIS HOUSING GROUP, ARCHITECT: SHP, MODULAR SYSTEM: FUTURE GENERATIONS, COMPLETION: 2005
Lansdowne Crescent, Notting Hill
A seven storey building to provide five luxury apartments in Notting Hill including a penthouse duplex.
CLIENT: OCTAGON DEVELOPMENT LTD, ARCHITECT: JOHN PAWSON/PAUL DAVIS & PARTNERS, VALUE £2.9M, COMPLETION: 2004
Beaufort Court, Fulham
A development of 65 houses, flats and maisonettes arranged in three blocks of between two and six stories on a restricted site in central London. The main structure is in light gauge steel.
Building for Life Case Study

CLIENT: PEABODY TRUST, ARCHITECT: FEILDEN CLEGG BRADLEY STUDIO, VALUE: £7.1M, COMPLETION: 2003
Canning Town Regeneration
A master plan to transform Canning Town and Custom House into an attractive mixed community residential district.
CLIENT: LONDON BOROUGH OF NEWHAM, ARCHITECT: SHILLAM + SMITH
Eastern Quay Apartments
An eleven storey apartment building which is part of a large development in London's Docklands.
CLIENT: WIMPEY HOMES HOLDINGS LTD, ARCHITECT: GARDNER STEWART ARCHITECTS, VALUE: £12M, COMPLETION: 2003
Anderson House, London W1
An unusual house inserted into a void within the centre of a mixed residential/business block, enclosed on all sides by 7m high party walls. The structure, walls and finishes are of exposed concrete.
PRIVATE CLIENT, ARCHITECT: JAMIE FOBERT ARCHITECTS, COMPLETION: 2003
Ffinch Street House, Deptford
An energy efficient house with workshop which has been constructed on a brownfield site just off Deptford High Street.
CLIENT/ARCHITECT: ROBERT DOE, COMPLETION: 2003
Gospel Oak Estate, Camden
Repairs, improved security and landscaping and the provision of a system to integrate various sub-estates.
CLIENT: LONDON BOROUGH OF CAMDEN, ARCHITECT: SHILLAM + SMITH, VALUE: £5.5M, COMPLETION: 2002
Western Beach Apartments
Provision of 120 new homes in a dramatic high rise block. Particular attention was given to buildability to enhance cost efficiency, durability and speed of completion.
CLIENT: WIMPEY HOMES HOLDINGS LTD, ARCHITECT: GARDNER STEWART ARCHITECTS, VALUE: £12M, COMPLETION: 2002
Belgrave Square
Extensive restoration and modernisation of listed building to provide luxury accommodation with a basement swimming pool. Grade I Listed
ARCHITECT: WELDON WALSHE, VALUE: £5M, COMPLETION: 1999
Green Dragon House
A new high density social housing scheme on a restricted inner city site.
CLIENT: SOHO HOUSING ASSOCIATION, ARCHITECT: MONAGHAN BLYTHEN ARCHITECTS, VALUE: £2.2M, COMPLETION: 1999
Shack
The Shack is a hide for a photographer. The building was produced using models on site, reducing the number of drawings to a minimum. 
ARCHITECT: NIALL MCLAUGHLIN, COMPLETION: 1998
Chesham Estate, Belgravia
The phased redevelopment of the Estate to provide luxury apartments and houses.
ARCHITECT: WELDON WALSHE, VALUE: £16M, COMPLETION: 1999

Hyde Park Flats, Sheffield
The award winning modernisation of two 1960s slab blocks of nearly 600 flats.
CLIENT: SHEFFIELD CITY COUNCIL, ARCHITECT: SHEFFIELD DBS & PETER BELL, VALUE: £24M, COMPLETION 1992